Proposed 2019-2028 Capital Improvements Program

Table of Contents

2019-2028 Summary    Public Works Engineering Division 62
  CIP Summary 2019 1   Culvert & Outfalls Program 63
  CIP Summary 2020 2 Public Works - Operations Division 64
  CIP Summary 2021 3   Road Resurfacing 65
  CIP Summary 2022 4   Sidewalk Improvements 76
  CIP Summary 2023 5   Main Street Asphalt Shim & Overlay 83
  CIP Summary 2024 6   Wagon Hill Farm Shoreline Protection 84
  CIP Summary 2025 7   Oyster River Dam (Mill Pond) Feasibility Study 85
  CIP Summary 2026 8   Mobile Air Compressor 86
  CIP Summary 2027 9   Backhoe Replacement (cost split w/Water & WW) 87
  CIP Summary 2028 10   Roadway Sweeper 88
  CIP Yearly Total by Fund 11   Dame Road Paving 89
Proposed Debt Schedules 12   1/2 Ton Pickup Replacement 90
Business Department 17   Aerial Bucket Truck 91
  Update Property Tax Maps - Assessing 18   Dump Truck Replacement 92
  5-Year Cyclical Update - Assessing 19   Sidewalk Plow Tractor Replacement   98
  VISION Software Conversion - Assessing 20 Public Works -Sanitation Division 99
  Municipal Software Package 21   30 CY Rolloff Containers 100
Economic Development 22   Roll-off Truck 101
  Technology Drive Infrastructure Improvement 23   Front End Loader 102
Fire Department 24   Skid Steer 103
  Beech Hill Tower Installation 25   Refuse Collection Vehicle Replacement 104
  Fire Station Upgrade 26   Recycling Collection Vehicle Replacement 105
  Breathing Apparatus Filling Station 27 Water Fund 106
  Defibrillator Replacement 28   Dover Road 8" Water Main 107
  Radio Simulcast Upgrades 29   Town/UNH Shared Water System Improvements 108
  Deputy Chief Vehicle Replacement 30   Wiswall Dam Spillway 109
  Medic One Replacement 31   Madbury Road Water Line Replacement 110
  Washing Extractor/Dryer Purchase 32   Backhoe Replacement (cost split w/Oper. & WW) 112
  Thermal Imaging Camera 33   One Ton Utility Truck Replacement 113
  Utility Vehicle Replacement 34 Wastewater Fund 114
  Asst. Chief Vehicle Replacement 35   Wastewater Facilities Plan 115
  Turnout Gear 36   WWTP Major Components Contingency 116
  Forestry Unit Replacement 37   Collection System Repair/Upgrade (Town/UNH) 117
  Tanker Refurbishment 38   Collection System Repair/Upgrade (Town Only) 118
  Chief Vehicle Replacement 39   3/4 Ton Pickup Truck Replacement 119
  Fire Prevention Vehicle Replacement 40   18" Force Main Replacement 120
  New Fire Station 41   Beards Creek Sewer Design 121
  Engine 1 Refurbishment  42   WWTP Phase III 122
  SCBA Replacements 43   Backhoe Replacement (Cost split w/Oper. & Water) 123
  Airbags for Vehicle Extraction Replacement 44   Commercial Lawnmower 124
  Portable Radio Replacements 45 Parking Fund 126
  Rescue 1 Replacement 46   Parking Services Software 126
Information Technology 47 Churchill Rink 127
  IT Equipment Replacement 48   Renovations 128
  GIS Program 49 Downtown TIF District 129
Police Department 50   Structured Parking 130
  Vehicle Replacement  51   Downtown TIF - Purchase of Parking Lot (Sammys) 131
  Beech Hill Tower Installation 52    
  Radio Simulcast Upgrades 53    
Public Works - Building & Grounds 54    
  Purchase of Solar Panels at Town Facilities  55    
  Commercial Lawnmower 56    
  Downtown Holiday Decorations 57    
  3/4 Ton Pickup Replacement 58    
  Purchase of Solar Panels at Gravel Pit 59    
  One Ton Dump Truck Replacement 60    
  1/2 Ton Pickup Replacement 61