Proposed 2025-2034 Capital Improvements Program

Table of Contents

CIP Cover      
2025-2034 Summary    Public Works - Operations Division 61
  CIP Summary 2025 1   Road Resurfacing Program 62
  CIP Summary 2026 2   Road Resurfacing Program - UNH 64
  CIP Summary 2027 3   Crack Seal Program 65
  CIP Summary 2028 4   Sidewalk Improvement Program 66
  CIP Summary 2029 5   Drainage System Rehabilitation Program 68
  CIP Summary 2030 6   Stormwater Management Program - Permit Compliance 69
  CIP Summary 2031 7   Facility Infrastructure Improvements 70
  CIP Summary 2032 8   Dump Truck Replacement (3-5 Ton) 71
  CIP Summary 2033 9   Madbury Road Complete Streets Project - Roadway, Sidewalk, Drainage Construction 77
  CIP Summary 2034 10   Vibratory Roller 79
Business Department     Motor Vehicle Fluid Distrubution System Replacement 80
  Municipal Software Package 12   Mobile Air Compressor Replacement 81
      Front End Loader Replacement 82
Fire Department 13   Engineering Jeep Replacement 83
  Replace 2012 Marion Tanker (Tanker 4) 14   Longmarsh Road Bridge Replacement 84
  Replace Thermal Imaging Camera 15   Sidewalk Plow Tractor Replacement 85
  Replace 2016 Chevrolet Tahoe (Chiefs Car) 16   Pickup Truck Replacement (Dodge Ram) 86
  Fire Station Facility Improvements 17   Rubber Tire Excavator Replacement (Cost share with Water Fund 25%) 87
  Purchase Personal Protective Equipment (PPE) 18   Roadway Sweeper Replacement 88
  LMR Communication System Backup Emergency Power 19   Pickup Truck Replacement (3/4 Ton) 89
  Replace Self Contained Breathing Apparatus (SCBA) 20   Front End Loader Replacement 90
  Replace Hydraulic Rescue Tools 22   Sidewalk Plow Tractor Replacement 91
  Replace 2007 Ford F-350 (Forestry Truck) 24     
  Replace Airbags for Technical Rescue 25 Public Works Department - Sanitation Division 92
  Replace 2013 Chevrolet 2500 (Utility Truck)  26   Rolloff Truck Replacement 93
  Portable Radio Replacements  27    
  Replace 2017 Ford Explorer (Fire Prevention) 28 Water Fund Projects 94
  Fire Station Kitchen Renovations 29   Town Water System Improvements 95
  Refurbish 2015 Marion Pumper 30   Town/UNH Shared Water System Improvements 96
  Replace 2021 Ford F-350 (Medic Truck) 31   Madbury Road Complete Streets Project - Water Line Replacement 98
  Defibrillator/Monitor Replacement 32   Rubber Tire Excavator Replacement (Cost Share w/General Fund 75%/25%) 99
  New Fire Station 33   Utility Truck Replacement (One Ton) 100
  Replace 2015 Ferrara Aerial Truck 34 Wastewater Fund 101
  Automated CPR Device 35   Wastewater Facilities Plan 102
  Refurbish 2018 Marion Pumper 36   Collection Systems Repair/Upgrade (Town/UNH) 103
  Automated External Defibrillators (AED's) 37   Collection Systems Repair/Upgrade (Town Only) 104
 Replace 2013 Can-Am UTV 38   WWTP major Components Contingency  105
 Replace 2021 GMC Yukon XL (Car 1) 39   Commercial Lawnmower Replacement 106
 Replace 2022 GMC Yukon SL (Car 2) 40   Pickup Truck Replacement (One Ton) 107
 Replace Land Mobile Radio (LMR) Communications Connectivity 41 Parking Fund Projects 109
 Replace 2024 Polaris UTV 42   Parking Vehicle Replacement 110
GIS Projects 43 Churchill Rink Fund 111
  GIS Program 43   Battery Powered Zamboni Ice Resurfacer Purchase 112
Information Technology 45 TIF Projects 113
  IT Equipment Replacement 46   Purchase of Parking Lot (Sammy's Lot) 114
Police Department 47    
  Vehicle Replacement 48    
  Sidearm (Pistol) Replacement 49    
Public Works - Buildings & Grounds 50    
  Seasonal Decorative Lighting 51    
  Wagon Hill Farm Bickford Chesley House Resortation 52    
  Dump Truck Replacement (One Ton) 54    
  Purchase of Solar Panels (Gravel Pit) 55    
  Pickup Truck Replacement (1/2 Ton) 56    
  Courthouse/Old Town Hall Design & Enhancements 57    
  Pickup Truck Replacement (3/4 Ton) 58    
  Commercial Lawnmower Replacement  59    
  Dump Truck Replacement (One Ton) 60